Jira user story template with acceptance criteria
Use this template when a team writes user stories and you want each one to state the story, its acceptance criteria, and what is out of scope in the same format. The author fills in the Summary and replaces the placeholders, and the template provides the structure of the description.
What does the template contain?
| Setting | Value |
|---|---|
| Name | User story |
| Template type | Single work item |
| Space and work types | Your software spaces, work type Story |
| Application scope | Create view and Work item view |
| Category | Software |
| Description | The text below |
The Description has four headings, a checklist, and a bulleted list. The words “As a”, “I want”, and “so that” are bold:
User storyAs a [role], I want [goal], so that [benefit].
Acceptance criteria[ ] Given [context], when [action], then [result].[ ] Given [context], when [action], then [result].
Out of scope- [What this story doesn't include]
Notes and linksWritten by $CURRENT_LOGGED_USER_NAME on $TODAYThe template doesn’t set the Summary, so the author gives the story a title. In a rich text field, $CURRENT_LOGGED_USER_NAME becomes a mention of the user who chooses the template, and $TODAY becomes a date. See Variables.


Steps
- Select Apps > Issue Templates Agent > Templates, and select Create template.
- In the Select a template type dialog, choose Single work item, and select Create.
- Select the name New template, and type
User story. - On the Parent template tab, open Space and work types, and choose your software spaces with the work type Story.
- Select Description. In the editor, add the headings, make the three phrases bold, add the checklist under Acceptance criteria, and add the bulleted list under Out of scope.
- Open the General settings tab. Under Application scope, select Create view and Work item view, and under Category, enter
Software. - Select Save template.
For the options on each screen, see Create a template.
Result
When a user creates a Story in one of the spaces and chooses User story in the Template field, Jira fills in the Description. The same template works on a story that already exists: see Apply a template to an existing work item. The user replaces the placeholders in square brackets, ticks the criteria as the team meets them, and writes the Summary.


How can you adapt the template?
- To add the same tasks to every story, create a Parent + Children (two levels) template with sub-tasks such as
Design: $PARENT_SUMMARY,Implement: $PARENT_SUMMARY, andTest: $PARENT_SUMMARY. The app replaces$PARENT_SUMMARYwith the Summary of the story. See Add child templates. - To add a definition of done that applies to every story, add a heading
Definition of donewith a checklist, for exampleCode reviewedandTests passed. - To pre-fill the template for every story in a space, set it as the default template for that space and the Story work type. See Set a default template.