Jira test plan template with a test case table
Use this template when a QA team plans a round of testing and you want every plan to state the scope, the environment, the test cases, and the exit criteria in the same format. The author fills in the Summary and completes the table, and the template provides the structure of the description.
What does the template contain?
| Setting | Value |
|---|---|
| Name | Test plan |
| Template type | Single work item |
| Space and work types | Your software spaces, work type Task |
| Application scope | Create view |
| Category | QA |
| Labels | test-plan |
| Description | The text below |
The Description has an info panel, four headings, a table, and a checklist:
[Info panel] Record the result of each test case in the table, and link the bugs you find.
Scope[What is tested and what is not.]
Test environmentEnvironment: [environment]Build or version: [version]Test period: from $TODAY to $NEXT_WEEK
Test cases| ID | Test case | Expected result | Result || TC-1 | | | || TC-2 | | | || TC-3 | | | |
Exit criteria[ ] Every test case has a result.[ ] No open bug blocks the release.[ ] The results are shared with the team.The template doesnโt set the Summary, so the author names the plan. $TODAY becomes the date of the day the author chooses the template, and $NEXT_WEEK becomes the first day of next week. The author changes the end of the test period when it differs. See Variables.


Steps
- Select Apps > Issue Templates Agent > Templates, and select Create template.
- In the Select a template type dialog, choose Single work item, and select Create.
- Select the name New template, and type
Test plan. - On the Parent template tab, open Space and work types, and choose your software spaces with the work type Task.
- Select Description. In the editor, add the info panel, the headings, and the table with four columns and a header row and three rows. Add the checklist under Exit criteria.
- Select Other fields, and add Labels with the label
test-plan. - Open the General settings tab. Under Application scope, select Create view, and under Category, enter
QA. - Select Save template.
For the options on each screen, see Create a template.
Result
When a user creates a Task in one of the spaces and chooses Test plan in the Template field, Jira fills in the Description and the label. The user writes the Summary, adds the test cases to the table, and ticks the exit criteria as the team meets them.


How can you adapt the template?
- To create the same tasks with every plan, create a Parent + Children (two levels) template with sub-tasks such as
Prepare test data: $PARENT_SUMMARY,Run the tests: $PARENT_SUMMARY, andReport the results: $PARENT_SUMMARY. The app replaces$PARENT_SUMMARYwith the Summary of the plan. See Add child templates. - To add more columns, such as the tester or the priority, change the table in the Description.
- To report the bugs that the tests find in a fixed format, use the Bug report template.
- To create a plan for every release, use a Jira Automation flow. See Recurring work items.
Test management in Jira
A table in a work item suits a small round of testing. To keep test cases in a repository, run them step by step, and follow the results of many runs, use Appsvio Test Management (ATM) for Jira Cloud.