Testing Project Dashboard
Each Testing Project has its own page with a dashboard. It shows how the Testing Project is set up, how many testing objects it has, and how testing is going.
Open the dashboard
- In the Jira sidebar, go to Apps › Test Management › Testing Projects.
- Click the tile of the Testing Project. To find it faster, use Search by name, Starred, or Jira Spaces above the list.
The page opens with the name of the Testing Project at the top. Click × to close it.

Testing Project configuration
The Testing Project configuration section shows where ATM finds your testing objects. You can collapse it.
It has one tile for each object: Requirements, Test Cases, Test Plans, Test Campaigns, Test Executions, and Defects. Each tile shows the Jira space and the work type. The Requirements tile also shows the Link type that connects requirements with Test Cases.
Only a Jira administrator can change this configuration. See Testing Elements and Permissions.
Counters
The counters below the configuration include All Requirements, All Test Cases, All Test Plans, All Test Campaigns, and Open Test Executions.
Click a counter to open the Jira work item search with a JQL query for that type of object. All Requirements includes every work type configured as a requirement.

Test Executions Progress
The Test Executions Progress section lists Test Executions with their key, name, Environment, and status. The TE Progress bar shows the progress of each Test Execution as a percentage. Only the latest iteration of each Test Case counts. An icon next to the section title opens the section in a new window.
For how progress is calculated, see Test Campaign.
Test Executions by environment
The Test Executions chart is a pie chart of Test Executions by environment. The legend shows the share of each environment as a percentage. Test Executions without an environment are in the No environment group.
You set the environment of a Test Execution in the ATM Environments field. See Create Test Execution and Global Environments.
Test Executions Trend
The Test Executions Trend chart shows the results day by day. Each bar splits into Passed, Failed, In progress, Blocked, and Not Executed.
Choose the time range with This Week, Last 7 Days, Last 30 Days, or This Month. Point to a bar to see the day, the status, and the number.

Workload by Assignee
The Workload by Assignee section shows one horizontal bar per person. The bar splits that person’s Test Case Executions by status. Test Case Executions without an assignee are in the Unassigned group.

To assign testers, see Run Test Execution.